[1] شرکت ملی صنایع پتروشیمی ایران، گزارش سالانه عملکرد صنعت پتروشیمی، تهران NIPC، 1404.
[2] A. Jakeman, R. Letcher, and J. Norton, “Ten iterative steps in development and evaluation of environmental models,” Environmental Modelling & Software, vol. 21, no. 5, pp. 602–614, May 2006.
[3] ISO 55000:2024, Asset Management – Overview, Principles and Terminology. Geneva: International Organization for Standardization, 2024.
[4] M. E. Jensen, “Monthly vs. Annual Cash Flow Modeling in Energy Projects,” Energy Economics, vol. 89,104812, 2020.
[5] Institute of Electrical and Electronics Engineers (IEEE), IEEE Reference Guide, New York: IEEE, 2020.
[6] ISO/IEC 31010:2025, Risk Assessment Techniques. Geneva: International Organization for Standardization, 2025.
[7] R. Smith, J. Chen, and L. Wang, “Indirect Upstream Resource Management through Downstream Optimization,” Chemical Engineering Research and Design, vol. 198, pp. 112–125, 2025.
[8] International Energy Agency (IEA), Investment Decision Framework for Energy Infrastructure, Paris: IEA Publications, 2025.
[9] T. Nguyen et al., “Single Point of Failure Analysis in Integrated Petrochemical Networks,” Journal of Loss Prevention in the Process Industries, vol. 78, pp. 104882, 2022.
[10] L. Zhang and Y. Liu, “Dynamic Sensitivity Analysis of Industrial Investment under Uncertainty,” Journal of Cleaner Production, vol. 410, pp. 137215, 2025.
[11] M. Ebrahimi, “Return on Asset (ROA) as a Key Performance Indicator in Iranian Petrochemical Sector,” Iranian Journal of Economic Studies, vol. 12, no. 1, pp. 45–62, 2023.
[12] A. J. Jakeman, O. Barreteau, and P. Hunt, Integrated Assessment and Decision Support in Environmental Management, Cham: Springer, 2020.